製品
商品の詳細
ホーム > 製品 >
50kn Wire Rope Traction Winch for Power Line Construction

50kn Wire Rope Traction Winch for Power Line Construction

MOQ: 1set
価格: 交渉可能
標準パッケージ: case
配達期間: 15-35days
決済方法: L/C, T/T
供給能力: 100sets/month.
詳細情報
Place of Origin
China
ブランド名
HANYU
証明
ISO9001
Model Number
BJJM5Q
Pulling force:
50kn
Weight:
190kg
Type:
Wire Rope Traction Winch
Pulling speed:
5m/min
Usage:
Power Line Construction
Power:
HONDA GASOLINE GX390 13HP
ハイライト:

50kn wire rope winch

,

power line construction winch

,

transmission line stringing equipment

製品の説明

Transmission Line Stringing Equipment BJJM5Q Wire Rope Traction Winch

 

Model Gear Pulling force(KN) Pulling speed(m/min) Power Weight (kg)
BJJM5Q Slow 50 5 HONDA GASOLINE GX390 13HP 190
Fast 30 11
Reverse - 3.2
BJJM5C Slow 50 5 Diesel engine 9kw 220
Fast 30 11
Reverse - 3.2
 
It is used for tower erection and sagging operation in line construction. It can also be used for pulling conductor or underground cable. The winches are the construction tools of erecting electric circuits of high pressure electric transmission in the sky and laying electrical cables underground. It can complete the tasks of heavy-lifting and dragging such as erecting the wire. Testified by the experiments and practical uses, they have reasonable structure, small volume, light weight, strong power, nimble operation and convient transporting. Based on so many advantages.
 

Operation methods

1. Before turning on the machine, you must turn on the clutch first and put the racker for crosspiece - changing in the zero position.

2. When moving the crosspiece, you should be quick. Otherwise the brake won’t work well. When turning on the machine, you shouldn’t work too fiercely.

3. When changing the crosspiece position, you must turn on the clutch. Otherwise the gear will be damaged. After that, you should check whether the changing job is well done. Make sure you haven’t changed two crosspieces in one time.

4. If there is any difficulty during the process of changing crosspiece position, you shouldn’t try to complete the job forcefully. Instead you should use the hand installment to help you complete the job. Concrete procedure: using the spanner to move the hand installment to a position with a certain angle, then you can change the crosspiece position smoothly.

 

Features:
1. Speedy and Efficient.
2. Safe and Reliable.
3. Compact structure.
4. Small volume.
5. Light in weight.
6. The wire rope can be directly wound on the winch.


50kn Wire Rope Traction Winch for Power Line Construction 0

製品
商品の詳細
50kn Wire Rope Traction Winch for Power Line Construction
MOQ: 1set
価格: 交渉可能
標準パッケージ: case
配達期間: 15-35days
決済方法: L/C, T/T
供給能力: 100sets/month.
詳細情報
Place of Origin
China
ブランド名
HANYU
証明
ISO9001
Model Number
BJJM5Q
Pulling force:
50kn
Weight:
190kg
Type:
Wire Rope Traction Winch
Pulling speed:
5m/min
Usage:
Power Line Construction
Power:
HONDA GASOLINE GX390 13HP
Minimum Order Quantity:
1set
価格:
交渉可能
Packaging Details:
case
Delivery Time:
15-35days
Payment Terms:
L/C, T/T
Supply Ability:
100sets/month.
ハイライト

50kn wire rope winch

,

power line construction winch

,

transmission line stringing equipment

製品の説明

Transmission Line Stringing Equipment BJJM5Q Wire Rope Traction Winch

 

Model Gear Pulling force(KN) Pulling speed(m/min) Power Weight (kg)
BJJM5Q Slow 50 5 HONDA GASOLINE GX390 13HP 190
Fast 30 11
Reverse - 3.2
BJJM5C Slow 50 5 Diesel engine 9kw 220
Fast 30 11
Reverse - 3.2
 
It is used for tower erection and sagging operation in line construction. It can also be used for pulling conductor or underground cable. The winches are the construction tools of erecting electric circuits of high pressure electric transmission in the sky and laying electrical cables underground. It can complete the tasks of heavy-lifting and dragging such as erecting the wire. Testified by the experiments and practical uses, they have reasonable structure, small volume, light weight, strong power, nimble operation and convient transporting. Based on so many advantages.
 

Operation methods

1. Before turning on the machine, you must turn on the clutch first and put the racker for crosspiece - changing in the zero position.

2. When moving the crosspiece, you should be quick. Otherwise the brake won’t work well. When turning on the machine, you shouldn’t work too fiercely.

3. When changing the crosspiece position, you must turn on the clutch. Otherwise the gear will be damaged. After that, you should check whether the changing job is well done. Make sure you haven’t changed two crosspieces in one time.

4. If there is any difficulty during the process of changing crosspiece position, you shouldn’t try to complete the job forcefully. Instead you should use the hand installment to help you complete the job. Concrete procedure: using the spanner to move the hand installment to a position with a certain angle, then you can change the crosspiece position smoothly.

 

Features:
1. Speedy and Efficient.
2. Safe and Reliable.
3. Compact structure.
4. Small volume.
5. Light in weight.
6. The wire rope can be directly wound on the winch.


50kn Wire Rope Traction Winch for Power Line Construction 0